Deck Layout L7H Platform for Total
Total E & P
Foundation frames, tie-down solutions and walkway bridge
Offshore / Total L7H platform, Netherlands
In Construction
2010
On the Total L7H platform a gas-well is blocked. To solve this problem, a coiled tubing rig-up tower will be placed on top of the well to remove the obstruction. The Seafox 2 jack-up platform will be temporarily positioned near the L7H and guide coiled-tubing via a flow-line bridge to the rig-up tower on the L7H deck. A walkway bridge will be used to connect both platforms.
TWD was requested to draw, and engineer the following items:
- Layout for the Total L7H deck, and corresponding connections to the Seafox 2.
- Rig-up tower tie-down solution, with corresponding padeye connections to the L7H deck.
- Engineering of support frames for the walkway bridge, tie-down beams and rig-up tower.